The Journey to Lean

A Journey into Lean Manufacturing

One Piece Flow

One Piece Flow vs. Batch Work- Getting Our Heads Around Which Is Better!

The issue of whether one piece flow or batch work is best has been an issue much debated here at Stokes & Rowe!  When we first set up our assembly department we instinctively started assembling our products using batch work.  It made sense to us and seemed like the obvious way to do things.  And funnily enough, every new member of staff who has started has automatically veered towards doing batch work too!  The reasoning was that we’d be more efficient completing all of one process before moving onto the next.   For example, putting all the o rings in all the filter housings, then moving onto all the collets, then putting in all the springs… you get my drift.  And we did this for quite a while.  But then we started seeing it’s flaws…

Read More

Red Tag

Setting up a Red Tag System

As a company manufacturing a wide range of components, we have lots of different types of tooling in our factory.  But we don’t want unnecessary tooling crowding our work space as this just leads to waste.  The same goes for the components we make.  Like all companies, we occasionally get parts that are not quite right and are rejected during our quality control processes.  A lot of these can be reworked so we don’t want to throw them away.  But how do we manage this so that we don’t have rejected parts piling up over time and tooling that ‘might get used for something in the future’ taking over?  That is where setting up a red tag system will help.

Read More

Lean ordering system

Setting up a Lean ordering system

Something that has always been a bit of a pain for us is ordering material.  The responsibility for looking at the technical drawings and working out what was required has always fallen solely on Rob’s shoulders.  But this  just added to his already-bursting-at-the-seams workload!  We knew there had to be an easier way to work out our material requirements based on our orders.  And it also had to be done in a way that anyone could take charge of it, not just Rob.  But we also didn’t want to have to start spending out on computer software.  So we set out to come up with a really simple, free, Lean ordering system.

Read More

Lean ideas

Sharing Lean Ideas

Well, it’s been just over three months into our Journey to Lean in 2017!  Time is really flying!  You’ve seen our recent post on how we’ve taken our inspiration from Fastcap and how important we feel it is to share Lean ideas and inspire each other.  So it has been wonderful to share what we’ve been doing with you all.  And it’s even nicer when you also get in touch!  And in that vein, we want to share with you a few of the Lean ideas and experiences that have been shared with us so far!

Read More

Lean environment

Sustaining a clean, Lean environment

If you’ve read our previous post on 3s, you’ll know that after you’ve sorted and swept, it’s all about sustaining what you’ve put in place.  We’ve all been working really hard to implement lots of Lean techniques and don’t want that to go to waste.  So we’ve put some measures in place to help us sustain the clean, Lean environment we’re creating and we’d like to share them with you.

Read More

Lean inspiration

Lean Inspiration- Fastcap

We’ve been keeping you up to date with the Lean improvements we’ve been making here at Stokes & Rowe but we also want to share with you all where our Lean inspiration has come from.  We really believe that an important part of ‘going Lean’ is the sharing and exchange of ideas.

Read More

Video- Process Improvements- Tap Assembly

Here is a video showing an improvement we have made in the assembly department.  Nicola has used Kaizen foam to make a jig to aid with tap assembly, saving time and giving added protection to the components.  Subscribe to our youtube channel for more videos.

Read More

Video- Process Improvements- Filter Assembly

Here is the youtube video showing an improvement we’ve made in the assembly department.  Here Nicola is demonstrating how we have made the process of inserting brass inserts into filter heads much quicker and easier by incorporating a jig and an air tool.  Subscribe to our youtube channel for more videos.

Read More

Process Improvements

Process Improvements in the Assembly Department

We recently showed you some of the process improvements we’ve been making in the machine shop.  But we haven’t stopped there!  We have been improving lots of our processes in the assembly shop too.  These improvements are saving us such a lot of time as well as making jobs simpler and more manageable for the team.

Read More

Video- Process Improvement- Unbolting Toolholders

Here is the Youtube video of an improvement we’ve made in the machine shop.  Here Rob has improved his set up process by using an air impact driver instead of alan keys to undo and do up bolts.  It has saved us up to half an hour per set up. Subscribe to our youtube channel for more videos.

Read More

Page 1 of 2

Powered by WordPress & Theme by Anders Norén

Pin It on Pinterest

Share This